Hi All,I have a question here. I've recently bought a chiller. Is it normal for a Hailea HS28A chiller with 1/10 HP to cool down a 60cmx28cmx20cm (2ft)tank from 26c to 25c using about 35mins to 40mins on an average temp day? I'm having an external temperature probe installed and my canister has a flow rate of about 700L/H.My placement of the chiller is at a space where air ventilation is quite good. Chiller kick-out time is about 50mins to 1 hour.Thanks ALL!