If possible for yr current setup, advice to go for compressor. 1HP CARRIER brand costing below 1K. Got mine done 2 yrs ago and still running. For my 4 by 2.5 by 2.5 ft with sump, takes abt 1h 20mins to cool down from 27 to 25 deg. 5 - 6 hrs later will kick in again( with 8 tubes T5 on).

Using chiller, its more costly say compare to 1/2 HP and above. Efficiency of cooling takes 3 times longer, not forgeting the heat and the noise.